1. The trail system as been repainted to match the new map
2. ODNR is doing trail Maintnance with Bulldozers
3. Ground Bees are being reported in several spots on trails.All are now gone with winter setting in.
4. Mounting Blocks have been located through out trails.
5. Tie lines have been replaced and new Gravel put under in the State camp
6. New tie ups have been installed at Table Rock and Artesian Well
7. All New Maps Are Installed Throughout The Trail System